Flap Drilling and Deburring – Day 1

I got all of the ribs drilled. Luckily the holes were all final sized already. There were just the two holes on each nose rib that were non-existent that I had to drill. Unfortunately I found another issue with a rib while I was deburring it. It was cracked where they had folded it during manufacturing. So I ordered another one of those which hopefully they will arrive while I’m in Mexico so I can get back and get started right away. I need the parts so that I can get everything primed and put together. I was going to finish one of the flaps but that broken nose rib put a stop to that. That is it work wise until I get back from Mexico.

Edit: I went back out and did two more hours of deburring. Might as well get parts deburred that are going to need it anyways. Gotta keep the assembly line moving!

Comments

Leave a Reply

Your email address will not be published. Required fields are marked *