Category: Fuel System

  • Tanks Prepared for Disassembly

    Tanks Prepared for Disassembly

    I got the left tank 100% complete for disassembly and dimpling. I got the right tank to the same spot also but since I am missing the J channel I’ll have to leave it where it is at until I can get that done. Luckily they shipped it today so fingers crossed it arrives before the weekend. But I got all of the zee brackets finished, primed and nutplates riveted. I also got the countersinking done on the rear rows of rivets. I feel I’m going to have to countersink the T-1005-L&R brackets because they are super thick, but it doesn’t say so. I’m betting they are expecting us to know when it is needed by now so I plan on reviewing what other’s did to that area. I don’t know if I should countersink the skin and leave the brackets alone or counter sink the brackets and dimple the skins.

  • Tanks Mostly Assembled and One J-Channel Drilled

    Tanks Mostly Assembled and One J-Channel Drilled

    I got all of the parts deburred today and I assembled the tanks. I realized last week that I only had one J-channel where I needed two for this next step. I ordered the replacement but I’m not sure how long that is going to take to arrive from Van’s. I got at least one tank J-channel cut and drilled.

  • More Tank Part Deburring

    More Tank Part Deburring

    Just more edge and hole deburring. This was a good way to destress from the past few days. The ribs in this photo still need the edge rivet holes deburred and then I need to deburr the parts on the back edge of the table still. But the parts next to the tools are complete

  • Tank Ribs Straightened and Zee Brackets and Stiffeners Separated and Deburring Started

    Tank Ribs Straightened and Zee Brackets and Stiffeners Separated and Deburring Started

    Long title but I try to put what I did in the title. I got all of the tank ribs deburred today. It only took another hour to finish that. I then separated all of the zee brackets and tank skin stiffeners and started deburring some of them.

  • Straightening Tank Ribs Day 1

    Straightening Tank Ribs Day 1

    Here are all of the wings parts gathered for the next section of assembly.

    I had on and off again time to work on the ribs. That’s why I think this took me longer than usual as I kept getting interrupted. Either way I got 10 of the ribs done and only have another 6 to do tomorrow if I get time with all the Mother’s Day prep we are doing for church on Sunday.