Tag: Access & Floors

  • Access Panel Section Complete!

    I don’t have all of the access panels installed as I still need to do work behind them, but they are all done as of today. I need to start getting the fuel system plumbed up and then I need to check with Vans to see if my backordered aluminum tubing is coming anytime soon as that is needed to finish the elevator actuation controls that go in the central channel. Its coming together though!

  • Tunnel Covers Prepped for Primer

    I got all of the parts ready for priming for the central tunnel. Luckily the final sized holes helped speed this up quite a bit

  • Rear Seat Floors Riveted

    I decided to relisten to General Conference from April 2025 while riveting in the seat floors. Pretty mindless work and gave me a chance to recap conference again before the next conference happens here in October.

  • Rear Floorboards Installed

    I decided I could at least get the rear floorboards installed while I’m finishing my planning for the conduit runs under the rear seats/baggage area. That was a bigger pain than I expected LOL They had solid rivets for the flanges on the sides and rear. There wasn’t an easy place to sit to do the work so I was contorting myself around to get it all done. But they are fully installed now!